Shahrood railway bridge, under construction

Shahrood Bridge being erected along the Qazvin-Rasht-Anzali railway, under construction

Shahrood Bridge will have a completed length of 595 meters

Shoring system in place to support formwork for concrete arch construction

Iranian construction laborers atop scaffolding, installing formwork

Zoom out view of formwork set in place

Bridge concrete formwork being erected

Volvo NL12 based concrete mixer and water tanker trucks, with KATO NK-200 mobile crane

Another KATO mobile crane hoisting bridge beams into place

Large telescopic mobile cranes hoisting prefab sections into place

Two Iranian-built HEPCO HC100C rollers trailing unidentified roller

A pair of track loaders, possibly Caterpillar, work the site

Bridge deck area being prepared

Proud members of the Sedad construction management team

Illuminated evening construction efforts

Photos: Sedad Company on Facebook